The maps illustrate how a university sports centre has changed from 2007 to now.
Overall, the sports centre has undergone a number of dramatic changes, the most important of which are the development of some new facilities for both recreational and teaching purposes, and the construction of research facilities and a new healthcare facility.
As can be seen in the pictures, a football pitch was built at the top of the map in 2007, but it was not suitable for all weather. However, today, students can play in all weather, and a new running track has been added around this area. There used to be three areas in the middle of the diagram in the past, but they have experienced some changes at present. While the swimming pool on the left side has remained, the teaching facility to the right of it has been expanded to consist about 47 people, and the tennis court in front of the swimming pool has been converted into a squash court.
The university sports centre also saw a number of changes. A temporary teaching hut at the bottom of the map was constructed in 2007 with three different areas, but it has been divided into four new facilities, including a first aid room, a clinic, a lab, and two storeyed teaching facilities.
