The given map illustrates the changes that happened to the park from 1980 to the present.
In general, the park is now more accessible and has several new facilities to serve the different recreational demands of society.
In 1980, there was only one pathway running through the entire park, from the west to the south gate. A number of trees were located in the north-east, and flowers were planted along the south wall. There was also a pond with several benches around it, situated on the eastern side of the park.
Between 1980 and now, the path was removed and replaced with a new path that leads to all four sides of the park and essentially divides it into four different areas. In the south-western corner, the pond and benches are still intact, but the flowers in that area have been replaced with bushes. A new picnic area with tables and a barbecue grill has been set up in the north-eastern corner, while the southeastern corner is now a dedicated playing field.
