The two plans illustrate on how the airport looks now and after it gets a redevelopment.
Overall, Southeast Airport has become more develop and convenient, with new facilities added or existing once are being expanded, such as a sky train, ATM, and a larger gates.
In the first illustration, Southeast Airport only has a check-in and a cafe in the departure side, to the north of it, there are places for pasport control and a security room. Furthermore, on the arrival side, there are currently no places being added. Also, there are only eight gates for now and a walkway to each gates.
Meanwhile, the airport is expected to have a huge upgrade in the second illustration. with having a bag drop,check-in venue, and a cafe at the departure side. Moreover, in the arrival side now includes a cafe, an ATM, and a place to hire cars. The gate section are also improved with now there are 18 gates instead of eight gates. There are also a skytrain to make it easier to reach each gates.
