The two plans illustrate modernisation of small theatre in 2010 and 2012.
Overall, the theatre was extended and redeveloped with various amenities for staff and visitors.
The main changes throughout the period have been expansion and reconstruction rooms next to the stage. For example, the territory from both sides of the stage has been expanded. The storage, which is located in the north-west, has been moved to a new area in the north-east side. The corridor has been prolonged in the north, while it was placed by the dressing room. Meanwhile, the dressing room has been transferred in the west side of the stage. A new shower was constructed for staff with an entrance from the dressing room.
Other amenities underwent several alterations as well. In particular, the cafe has been removed in the south-west and replaced by the ticket office, which was transferred from the south-west side. Moreover, the admin office has been shifted to the west side, next to the stage. Another interesting thing is that a new restaurant was contracted in the south-west.
