The given maps demonstrate how small theatre had been changed by 2012 after the 2 years of reformation. Overall, the space of construction was enlarged in 2012 compared to 2010. In addition, some facilities were relocated to make way for other facilities.
In 2010, in the mid-side of the facility, the seats were occurred opposite to the stage. At the back of the stage, there was a room for actors and actresses to get a dress which provided an entrance to the storage. On the left hand from the main door, there were an admin office and a ticket office. On the other hand, there was a café for guests.
By 2012, the theatre was made bigger compared to that of 2010. The location of a storage was relocated to make space for a dressing room beside showers. The dressing room was connected with the storage through a new corridor. The admin office and ticket office were transfigured into new locations to make space for restaurant
