The picture illustrates the plans of an airport site by comparing different conditions that will be redevelop in next year, and current airport situation. In the development lists, there are a lot of shops that will open in the airport, and architecture design will be renovated.
To start with, updated architecture design, in the recent year, it has only one boarding -gate route with waiting line is no shop. However, it is going to have two boarding -gate routes, renovating Y letter design or tail of a fish with some shops, in the following year. In addition, there is not any shops, ATM and parking spaces to hire a taxi at the arrivals gate, in the current condition. But, in the next year plans, there will have a café shop, beside the ATM, and the car parking for taxi rank, that is existed right side of its entrance door.
Furthermore, at the departures gate, there will be some exchange of places. For example, in the recent condition, the café is located opposite of check-in desk, that is left of entrance door. But, in the plans, check-in desk is going to be right side of the hall, then café and bag drop counter are going to be at the same sides.
In summary, airport development plans include so many positive improvements, and it is well-organized as well in adding some additional features.
