The plans compare the layout of a small theater in 2010 with its redesigned version in 2012.
Overall, the theater underwent major internal redevelopment, most notably through the introduction of multiple new facilities and considerable spatial reorganisation, while some other parts remained the same throughout the 2 – year time period.
In the northwest corner, the media was added in the space formerly occupied by the storage room with the addition of showers. The space previously used as the media room was converted into a hall, while the storage room was added on the left-hand side of the building. Meanwhile, the stage, positioned slightly to the south of the former media room was slightly enlargended, while its overall position remained largely unchanged.
The auditorium, located directly below the stage, remained unchanged over this two-year period. To the left of the main entrance, the ticket office was relocated to the cafe’s previous location, where it slightly increased in size. The admin office was moved slightly upwards, this combined with the relocation of the ticket office led to a addition of 2 new restaurants.
