The maps illustrate an island, before and after the construction of tourism-oriented facilities.
Overall, the island has undergone substantial changes: tourism-based accommodations have been erected, recreational facilities have been built. Meanwhile, a new pier has been constructed for operating sailing boats.
It is clear from the maps that the island has been reconstructed for attracting tourists. At the heart of the island a reception has been erected. A restaurant which is located on the north of the island has been built for providing tourist with meal and refreshment. Within walking distance from both sides of the reception housing and accommodations have been constructed. For connecting all residential and recreational facilities new footpath and vehicle track have been constructed.
When it comes to recreational facilities, the pier has been constructed on the periphery of the island. In proximity to the island near the beach new swimming area has been opened. Interestingly, no plants have been chopped down.
