The plans provide informations about the state of a harbour in the year 2000 and what it is at present.
Overall, there were numerous renovations to modernize the harbour.
As the plan suggests, in 2000, at the southern eastern region was a disused castle and a public beach. There were intersections of the main road with the car park, which also led to a path that directly linked to the lifeboat. A dock was located at the north east of the harbour. The marina and the fishing boats were located at the north west and the south west respectively.
Looking at the plan, at present, the southern axis of the harbour is where a new construction of the cafes and the shops are positioned. The castle at the rear end, towards the south east has been replaced with a hotel. And the public beach close to the former castle has been substituted with a private beach for the hotel. At present there is a route from the main road that intersects the lifeboat and the hotel. Also, there is an interchange of locations between the marina at the north east and the fishing boats at the south west region. The public beach situated at the north east still remains in is usual place while the dock has been doubled, and the distance between the fishing boats and the docks are now shortened. While new showers and toilets are now constructed in addition to the previous ones.
