🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 5+: The plans below show the site of an airport now and how it will look after redevelopment next year.

Image for topic: The plans below show the site of an airport now and how it will look after redevelopment next year.
Our system will evaluate the answer based on this AI-generated description.
The image shows two diagrams labeled "Southwest Airport" with "Now" and "After Development" plans. The "Now" diagram features a central airport control with six elements (gates 1-5, car park) surrounding it, labeled in clockwise order from the top left [car park, gates 1 and 2, gates 3 and 4, passport control and security, gate 5]. The "After Development" diagram shows the same central control but with fifteen elements, including additional facilities (gates 6-15, car park, check-in area, railway, bus station, car hire). The arrangement of elements differs, with the additional facilities appearing between the original ones, except for the bus station and railway that are placed together opposite security and passport control. No numerical data/percentages are visible.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The plans representing an airport’s infrastructure now and how it will be present in upcoming years.

The Airport in southwest now has 8 gates instances in the upper part. It is divided into two halves where departure centre in left and arrival centre in right. In between gates, there is a walkway. Café and check-in is present in between the passport control and departures.They are present in left and right half respectively. The security is available above passport control in the departure side while the custom is below it in arrival side.

In contrast with the next year plans, 18 gates are available with an shape of fish’s tail. The sky train is available between it. In addition of shops before the security. The café and check-in location replaced by each other, moreover a place for bag-drop is added. Furthermore, three points are also added: café, ATM and car hire between the custom and arrivals.

In conclusion, the development of southwest airport will be a good plan where a lot of services available in comparison to the airport now.

Word Count: 179

Answers On The Same Topic:

The plans below show the site of an airport now and how it will look after redevelopment next year.

The diagrams show how Southwest Airport looks now and how it will change after redevelopment next year. Overall, the airport will be expanded with more facilities and better transportation. At present, the airport has only one terminal with a few facilities. There are separate areas for departures and arrivals, and passengers must go through security […]

The plans below show the site of an airport now and how it will look after redevelopment next year.

The diagrams illustrate the current layout of Southwest Airport and the planned changes after its redevelopment next year. Overall, the airport will undergo significant expansion, with more gates, improved transportation, and additional facilities to enhance passenger convenience. In the departures area, several modifications will take place. A bag drop facility will be introduced, and while […]

The plans below show the site of an airport now and how it will look after redevelopment next year.

The plans illustrate the site of an airport, showcasing what it looks like both before and after the redevelopment. Overall, there will be significant changes in the redevelopment of the airport. Previously, there were very few facilities available. However, after the redevelopment, we will see numerous facilities added to enhance the airport experience. Looking at […]

The plans below show the site of an airport now and how it will look after redevelopment next year.

The glance of two pictorial diagrams depicts the current airport structure as well as the future depiction of the southwest airport after its redevelopment in the coming year. The current airport is having single doors for both departure and arrival. When passengers enter the departure on the east side, there is a café, as well […]

The plans below show the site of an airport now and how it will look after redevelopment next year.

The plans illustrate the present area of an airport and its possible redevelopment in the coming year. Overall, there will be two passages for each departure and arrival partition, and more facilities will be added, while the inspection department will remain the same. Also, the plan shows the necessity of increasing demand in Southwest airports. […]

See All

Other Topics:

the maps show a student hall of residence in 2010 and now

The two given maps illustrate the transformations that have taken place in a student hall of residence over a period of nearly two decades from 2010 to the present time. What is most striking when looking at the maps is that the hall has witnessed substantial modifications, with the most notable being the addition of […]

The maps show a shopping mall, as it is now, and plans for its development. Summarise the information by selecting and reporting the main features and make comparisons where relevants.

The maps illustrates the current layout of a shopping mall and the proposed changes to the area. Overall, the most notable change is the expansion of the shopping mall, which will replace the golf course and the park. A variety of shops will be added inside the shopping mall, in place of the cinemas and […]

The maps below show a bookstore in 2000 and now. Summaries the information by selecting and reporting the main features, and make comparisons where relevant. You should write at least 150 words.

The maps give information about the layout of a bookstore between two periods in 2000 and now. Overall, travel,new books and service desk remained unchanged between the given period. However, coming to the fiction zone, this structure was completely changed. Regarding 2000, there were two big fiction area. Additionally, travel, new books and service were […]

The diagram shows Rampart street today and the plan for changes to the street in 2035. Summarise the information by selecting and reporting the main features, and make comparisons where relevant

This maps illustrates Rampart street today and the plan for changes to the street in 2035 Overall, the area became more developed, with several new buildings and roads being added. We see the road for cars will be converted into a pedestrian path. Also some buildings disappeared and new facilities will introduce. Firstly, at present […]

The maps below show information about the change of Riverage college 30 years ago and now.

The two given maps illustrate the transformations that have taken place in a college named Riverage between 30 years ago and the present time. What is most striking when looking at the maps is that the college has witnessed substantial modifications, with the most notable being the appearance of recreational, academic amenities and green space, […]

The diagram shows the map of a University Sports Centre in 2007 and at present. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The map clearly illustrates the change that has taken place in the university sports centre between 2007 and the present. Overall, the sports centre has gone through several redevelopments. The centre now features a range of new facilities, with many original features being replaced and removed. The majority of the change has occurred in the […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Buy activation codes in bulk and give one to each learner. A code does not expire until it is used, and each subscription only starts counting once its code is entered, so you can buy now and hand them out later.

10+ codes: 10% off 25+ codes: 15% off 50+ codes: 20% off
The codes are emailed to your payment address as soon as the payment goes through, and are also shown on the confirmation page. A tax invoice is issued automatically at checkout — select Purchasing as a business there to put your organization's name and tax ID on it.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.