🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

Image for topic: WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.
Our system will evaluate the answer based on this AI-generated description.
The image shows two maps of Bunborough: the present-day layout and proposed plans for 2024. In the present, Bunborough features a road extending from Manchester to Lynchton passing through the village, a river, several houses clustered along the road, and a fishing port to the west. In the 2024 plan, additional elements include a new road loop around the village center, more houses filling existing spaces, a new hotel by the river, a car park adjacent to the hotel, and a restaurant near the car park. The previous fishing port area is labeled "yacht marina," and a new footpath connects the marina to the hotel.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps compare tge current layout if Bunborough village with its proposed plan in 2024.

Overall, despite some features remaining the same, this village will transfrom into a tourist destination, with significant changes in the infrastructure and on the coastal side amenities.

At present, Bunborough is located north west of the sea, with a river situates on the west of the village and flowes into the sea, there’s a road that crosses the village from north east to west, along which housing and shops are found. This same road is linked to aain road that connects Bunborough to Maychester by north and Lynwich by south. On the seafront area there is a fishing port with three docks. Moreover, a beach lies to the south west of the fishing port following the coast line.

By autumn 2024, a new road will be laid linking directly the village with Lynwich and a railway will be constructed around the village with a station on the outskirts. Some houses adjacent to the river will be relocated to th eopposite side of the road to allow for the train station to be built, meanwhile the overall number of the residential units will not greatly change. Although, the fishing port will be supplanted by a promenade and on the northern west of the latter a hotel will be constructed. Whereas, the shopping area and the beach will remain unchanged. While, another hotel will be built on the western side of the beach.

Word Count: 247

Answers On The Same Topic:

WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

The given maps illustrates the future plane of developing the village of Bunborough and the way it appears in the present day, Overall, it is obseved that the government is aware with the nescessity of incresing the means of transport in the village,also the number of housing will slightly increase, there is also a clear […]

WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

The two maps illustrates how the village of Bunborough looks like now and what the plans will be in 2024. Overall, it is clear that the village will undergo some significant changes. One of the plans for 2024 is to built a new trainrail, because of this new plan there are some houses that need […]

WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

The two illustrations showcase the village of Bunborough in the present day and future plans for the village in 2024. Overall, the plans signify an interest to expand the village’s residiency by adding houses, in addition to expanding its connectivity by including a station. Last but not least the new map includes a promenade. The […]

WRITING TASK 1 You should spend about 20 minutes on this task. The two maps below show the village of Bunborough in the present day and plans for the village in 2024. Summarise the information by selecting and reporting the main features and make comparisons where relevant. Write at least 150 words.

The two maps illustrate the differences between the current Bunborough and the planned proposals of Bunborough which is aimed to be done by Autumn 2024. Overall, transportation and tourism will be improved for the village by building railway station and hotels. A new road will also be constructed for a faster route. In the present […]

See All

Other Topics:

The images illustrate the layout of the town/city called Lakeside from 2000 to 2009/ over a span of 9 years(2000-2009).The images illustrate the layout of the town/city called Lakeside from 2000 to 2009/ over a span of 9 years(2000-2009).

The provided map illustrates how an area called Lakeside transformed over a nine-year period, from 2000 to 2009. Overall, it is evident that the area underwent a dramatic transformation, with the most significant changes being the disappearance of several residential areas to make way for an expanded industrial zone and other modern facilities. Looking first […]

The maps shows the changes made to the island before and now

The maps illustrate the construction transformations that have taken place on an island from the nearly uninhabited area to its variable tourist facilities as the redesign occurred. Overall, the island has been redesigned as a resort island for holiday, which the island was built as a tourist destination. The development of the island has the […]

The maps compare a present layout of the college and future developments to it

The maps compare the current layout of the educational institution with its future enhancements. Overall, it is apparent that the area will be changed significantly in the future. Notably, the most noticeable alterations will be the addition of a cafe, library, sports hall, administrative teaching areas, an extended staff room, a widened corridor, and three […]

The maps indicate how Huntingdon has changed throughout time, both in terms of present changes and anticipated future changes. Summarize the information by selecting and reporting the main points and make comparisons where relevant.

The map illustrates how the Huntingdon has changed throughout the time and how it will changed in future. Overall, the area experienced significant changes, the most notable development is the road and the bridge which will be removed in the future. Where as, roundabout will be constructed near a bridge . At present time,there is […]

Summarise the changes to Liverpool John Moores University from 2010 to 2016

The provided map demonstrates that the redevelopment took place at Liverpool John Moores University in the period from 2010 to 2016. Overall, the building has undergone significant redevelopment. Include three divided school buildings into one huge Science building. Changed the road and added technology to the library. In 2010, there was an admin building in […]

The map show changes between 1960 and now in the station Street

The maps compare the changes of the street station from now to 1960 . Overall,there are so many enhancement happened comparing to 1960. In year of 1960 , there were numerous institutes around the station street but now everything is replaced by new ones without dry cleaner’s . In details, on the right side of […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.