The two maps illustrate the changes that took place in the Biology School between 2015 and 2020
Overall, the school underwent a number of dramatic changes, the most important of which are the disappearance of green areas, the development of infrastructure catering for studied needs.
In the northwest, most of the tree were cut down to establish a lab and in the southwest, the wooded area was cleared to construct a car park. In the center of the school, the central library remained, while in the eastern section, the drama centre was converted into a music centre and the Teaching building opposite to the central library also extend.
The noticeable transformation took place in the north from 2015 to 2020, where most of the tree were chopped down to make room for the building of office and the unchanged, Meanwhile, the southeast of the map also witnessed significant changes, with the expansion of IT centre catering for the increase in student numbers.
