The map details alterations to the science park since 2008.
Looking from an overall perspective, it is readily apparent that this park has become more accessible, with cycle paths and bus stops; more commercial, with a station; and more educational, with a university hub. These changes have been made at the expense of grasslands and particular buildings. Offices and business units are the facilities that remained unchanged.
In 2008, there were large grasslands on the north side of this park, above the business units, and there was a reception on the right side of the woodlands, under the offices. However, over the years, these grasslands have been removed, and a research and development center has been built instead. The reception under the offices has also been converted into a university hub.
There were roads across the park and paths which connected the business unit, car park, cyber security center, and IT center. Nowadays, a large part of these roads has been replaced with cycle paths, and the paths between buildings have also been changed. A new bus stop has been built on the east part of this park as well.
While the car park has been decreased in size, the cyber security area has been expanded, and the IT center, under the car park, has been converted into an innovation center. Besides, a new station has been built on the south part of the map, on the railways.
