The two maps show the current office and how it is going to transform to a new working area for future advancement.
Overall, entrance will be moved to the bottom center of the building and kitchen areas will be demolished for giving more space for the office rooms. A couple of facilities will be constructed by removing the grass.
At present, the construction has four working spaces, lining next to the left hand side of the entrance. To the opposite of these offices, the map includes kitchen, canteen and a stock room. By walking down the entrance, workers can find the reception as well as the toilet if needed. For both left and right sides of the office center, grass is occupying the large spaces.
To reconstruct the area, the entrance and the reception will be moved to the bottom center area, dividing the two big offices. The kitchen and the canteen will be wrecked with the aim of giving spaces for the other two working rooms, whereas the stock room stay in the same position. But the WCs will be rebuilt next to the coffee area at the outside of the office on the right by removing the grass, and at the bottom of this site, spacious meeting area is planned to be erected. By stripping the grass on the left, three outdoor seating sites are about to set up.