The diagrams compare the layout of a school site in 2004 with the proposed plan for the same site in 2024.
Overall, the school is expected to undergo significant expansion over the 20-year period, mainly to accommodate a rise in student numbers from 600 to 1,000. This growth will involve the construction of new buildings, additional parking facilities, and the replacement of the sports field, while some existing features will remain unchanged.
In 2004, the school consisted of two main buildings. School Building 1 was located in the northern part of the site, next to the school entrance and a single car park to the west. School Building 2 stood further south, connected to Building 1 by a path. To the east of Building 1, there was a large sports field, while the southern area of the campus contained trees and open green space. A road ran along the southern boundary of the school.
By 2024, several notable changes are planned. A new School Building 2 will be constructed between the two existing buildings, and the original School Building 2 will be removed. Additionally, a third school building will be added to the east of Building 1, occupying part of the former sports field area. To cope with increased traffic, a second car park will be built on the eastern side of the site, while the original car park near the entrance will remain. Although the sports field will be relocated to the southeast corner, most of the trees in the southern section will be preserved, maintaining some green space.