The maps illustrate what changes took place at a school site between 2004 and 2024.
Overall, the area was expanded to accommodate more students, with the addition of a new school building at the expense of part of the sports field. In addition, the woodland was reduced in size to make way for a new car park, resulting in improved road infrastructure.
In 2004, the school – surrounded by woodland – catered for 600 students and consisted of two buildings facing one another to the north and south. These buildings were separated by a path branching off from the main entrance and leading to a spacious sports field in the north-east. The campus was accessible via a road running from the south-western corner to a car park at the northern end of the site, both of which remained unchanged by 2024.
By 2024, the two school buildings had been connected, while the path separating them had been shortened. The sports field had also been reduced in size and relocated to the opposite side of the site, making way for a new school building that almost doubled the school’s capacity. In addition, the school expanded its road network and introduced a new car park behind the third building. This development was made possible by clearing part of the woodland.
