The provided maps demonstrate the layout of a school site in 2004 and predictions for redevelopments in 2024
Looking from an overall perspective, it is readily apparent that the school is expected to undergo major expansion, with the addition of new buildings, increased parking space, and a reduction in green areas and of sports field.
In 2004, the school consisted of two buildings connected by a path. Building 1 was positioned to the north, while the second one was situated directly below it. A large sports field occupied the northeastern part of the site, and the entire southern area was covered with trees. There was only one car park, located to the west beside the main entrance and adjacent to the road. The school used to accommodate 600 students.
By 2024, several changes are planned. A third school building will be constructed to the east of the second building, and the sports field will be reduced and relocated slightly to the south. The original car park will remain at the same position, while a new car park will be added on the eastern side, replacing a significant number of trees. The internal road will also be extended to provide access to the new facilities. The updated site is expected to serve 1,000 students.
