The two maps illustrate the layout of a school campus in 2004 and its subsequent redevelopment by 2024. Overall, the school significantly expanded and modernized over two decades to accommodate an increased student population, with new facilities constructed and existing areas either relocated or enlarged.
In 2004, the school served 600 students, featuring School Building 1, School Building 2, and a path connecting them. A sports field was situated to the north of Building 1, and Car Park 1 lay to its west, adjacent to the main entrance and road. Extensive wooded areas bordered the southern and eastern parts of the site.
By 2024, the school’s capacity had risen to 1,000 students, leading to considerable changes. A new School Building 3 was constructed east of Building 1, utilizing previously wooded land. Simultaneously, the original sports field was removed, and its former site was redeveloped into Car Park 2, running parallel to the main road. The sports field itself was relocated to the south-east of School Building 2, requiring the clearing of more wooded areas. Additionally, Car Park 1 was expanded significantly to the south. Notably, School Building 1 and School Building 2 remained unchanged in structure, as did the main road and entrance, though the path was reconfigured to link all three school buildings.
