🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 9: The diagram below shows the present and planned development in the biomedical campus of a university.

Image for topic: The diagram below shows the present and planned development in the biomedical campus of a university.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two plans: the present biomedical campus and the planned biomedical campus. The present biomedical campus shows a layout with the following sections: "LAB," "GENE-TICS," "BIOTECH," "CAR PARK," and "BIOCHEMISTRY," all separated by roads and a walkway; there are trees in two sections. The planned biomedical campus includes: "GENETICS," "BIOTECH," "LAB," "BIOCHEMISTRY," "STAFF CAR PARK," "STUDENT CAR PARK," and a new addition, "BIO-IMAGING," all organized with some sections relocated and some retaining their spots, delineated by roads and walkways, with trees in the genetics section.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps illustrate the current layout and the proposed development plan for the biomedical campus of a university.

Overall, it is evident that the campus will undergo significant urbanization. The main changes involve the removal of greenery to facilitate the construction of new research facilities and the expansion of parking areas.

In the northern section, beyond the main road, the large area currently occupied by trees is set to be cleared. In its place, two new buildings, namely “Genetics 1” and “Bio-imaging,” will be constructed. Additionally, the existing car park in the top right corner will be designated specifically for students.

Regarding the southern section, the central walkway will remain, but the surrounding infrastructure will see notable alterations. To the west of the walkway, the trees will be removed to make way for a new diagonal road leading to a newly built cylindrical-shaped staff car park in the southwest corner. While the Lab and Biochemistry buildings will remain unchanged, on the eastern side of the walkway, the Biotech building is planned to be expanded. Furthermore, the existing Genetics building will be renamed “Genetics 2,” while the adjacent Lab will remain as it is.

Word Count: 194

Answers On The Same Topic:

The diagram below shows the present and planned development in the biomedical campus of a university.

The two plans compare the layout of a school in 1985 with its present arrangement, after the student population increased from 1,500 to 2,300. Overall, the school has been expanded to provide more teaching and recreational facilities. The number and capacity of classroom buildings have increased, while the former has been replaced by modern learning […]

The diagram below shows the present and planned development in the biomedical campus of a university.

The maps below illustrates the layout of the biomedical campus of a university at the present and after the planned redevelopment. From an overall, the biomedical campus will go through a significant modification in the future, combine with new facilities such as staff car park, bio-imaging. In addition, plants area will be destroyed to make […]

The diagram below shows the present and planned development in the biomedical campus of a university.

The two maps illustrate the current layout of a Biomedical Campus and the proposed changes for its future development. Overall, the campus is set to undergo significant expansion, characterized by the introduction of new academic facilities and specialized parking areas, resulting in a reduction of green spaces. Key Changes in the Western and Central Sections […]

The diagram below shows the present and planned development in the biomedical campus of a university.

The diagram presented depicts image of a present biomedical campus and the planned biomedical campus of a university. In the present biomedical campus there are a quite a number of trees as opposed to what was put in the planned image. The biochemistry plan was larger than what was presented in the present campus. It […]

The diagram below shows the present and planned development in the biomedical campus of a university.

The diagrams illustrate the current layout of a university’s biomedical campus alongside the proposed modifications for its future development. Overall, the campus is expected to experience substantial expansion, with the current building being enlarged and new specialized faculties being established. This development will mainly include restructuring the road system and converting some green areas into […]

See All

Other Topics:

The maps below show the village of Stokeford in 1930 and 2010. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The figures illustrate the village of Stokeford in 1930 and 2010. It is clearly seen that, there were more new houses constructed in 2010 compare than 1930. The farmland totally dispelled while, one tree was cut and removed from the garden and only two trees still located in the same place. The primary school to […]

The maps below show the changes that have taken place at the waterfront area of a town called Darwin between 2009 and 2014.

The provided maps depict the transformation of Darwin’s waterfront area between 2009 and 2014. A perusal of the maps reveals significant redevelopment, particularly in the southern section, while the northern part experienced more localized changes. Overall, the waterfront evolved from a more industrialised zone to one with enhanced recreational and educational facilities. In the northern […]

the diagram below shows the plans for designing a trade sho floor from 2009 to 2010

The diagrams compare the layout of a trade show floor in 2009 with a revised version planned for 2010, highlighting changes in the size and position of various facilities. Overall, the most striking change is the reallocation of space between the exhibition area and the conference hall: the former has expanded considerably, while the latter […]

The diagram below shows the changes of the town named Shakefield from 1995 until now. Summarise the information by selecting and reporting the main features, and make comparison where relevant.

The two maps illustrate the changes made to the town of Shakefield from 1995 to the present. Overall, the site has been completely redeveloped since 1995, shifting from a small coastal settlement with farmland and fishing facilities to a more developed residential and tourist area with new accommodation and infrastructure. In 1995, Shakefield was a […]

The diagram shows Lakeside development between years 2000 and 2009.

The two given maps illustrate modifications of the Lakeside area between 2000 and 2009. Overall, this area underwent extensive redevelopments, with commercial, educational and office facilities being constructed. Notably, the natural landscape was reduced in size to make way for an expansion of the industrial complex and there was a clear separation between this complex […]

The maps below show the centre of a small town called Islip as it is now, and plans for is development.

The given two maps illustrates the present area of Islip town centre and how it is expected to develop. Overall, the place is expected to have a significant transformation from residential to some addition of shopping centre and new housing. In the first map, to the north side shops is located while the main road […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.