The given maps illustrate the current construction of a college and the changes that are expected in the future.
Overall, the college building is going to be expanded by demolishing the green area. Furthermore, the entrance site is planned to change with the addition of new classrooms.
It is noteworthy that the garden and footpath facilities in the north are going to be cutted down to give way for expansion of college with the addition of a shop, toilets, and classroom at the northern part of the institution. In the west side, the footpath is expected to be pulled down and the car park will be extended to accommodate more students who own a vehicle. The entrance is projected to be moved to the center south, having a bus stop in the west, opposite to the road.
Regarding the inside of the building, it is planned to undergo significant changes by increasing the number of classrooms by two and to introduce a shop at the north-west corner. The area designated for lunch in the west is expected to remain in the same place, above the classroom as it was before. However, the classroom in the south-west corner is projected to be replaced by a library, at the west of the reception which will be located in the southern center of the building. It is planned to add new classrooms along the east part with the demolition of the library and reception. Moreover, the toilets which were in the middle south are going to be shifted to the north center between the shop in the west corner and the classroom in the east corner of a college.