The image displays a flowchart detailing the process of straw bale house construction. It begins with "Previous building demolished and ground prepared," followed by "Concrete stem wall," then "Straw bales." The subsequent step is "Roof and external finish," leading to "Internal installation," which breaks down into three components: "Electrics," "Plumbing," and "Insulation." After these, there is a "Structural inspection (Buildings Officer)" step, followed by "Decoration (painting, carpet, curtains, etc)," and the final stage, "Furnishing (white goods, furniture, entertainment systems)." Each step is consecutively connected with arrows indicating the flow of the construction process. No specific numerical data points or percentages are provided.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The data represents the process of costruction at straw bale house.
It is evident that construction begins with knock-down of previous buliding and prepared a plan ground for building a new house and it would be ready to innograte once decorated and fully furnished.
To initiate construction, first of all, the previous building on the land is demolished, and a plane ground is prepared as a base. Afterwards, a concrete stem wall is built, followed by straw bales. The roof and exterior work is finished and there comes the main work, Internal Installation, which is divided into three parts; Electrics, Plumbing and Insulation. Furthermore with the proper internal installation process the construction of house is completed. Now, a inspection of structure of building is followed by a building officer. Moreover, after the decoration and furnishing, the straw bale house is ready to move in.