🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

Image for topic: The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image consists of two floor plan diagrams. The top diagram features offices forming a straight line from left to right: three offices followed by a reception area. Above the reception area, adjacent are a kitchen, a canteen, and a stock room, then a WC at the top right. The top plan is annotated with 'entrance' at the bottom side and 'grass area' at the right side, with 'grass area' also at the left side. The lower diagram has an arrangement where the offices are in an L-shape with two offices on the top left and one on the bottom right of the left side. A stock room and WC are positioned adjacent near the middle right, followed by a meeting room at the far right. The bottom diagram boasts 'coffee machine' above the stock room and 'outdoor sitting area' on the far left. The text representation indicates orientation, space allocation, and fixture placement, with no numerical data provided.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps compare how the office building will shift in the future

Overall, it is evident that the current simplistic office building will be transformed into more specialized complex. Additionally, the key elements will be the introduction of new facilities, the expansion of work-related rooms and the removal of specific culinary areas.

This analysis will begin with the left-handed side of the office building. Initially, outdoor seating area will be erected on the grass land, while on the top- left, the kitchen and canteen will be transformed into new offices room. Furthermore, the separated small offices at the bottom-left of the layout will be reconstructed to office and reception.

Regarding the right-handed area of the layouts. It is apparent that there will be the addition of coffee and machine area on the top-right of the towel, whereas toilet and meeting will be built on the empty ground right next to the main function region. Although, the stock room remains unchanged, the original reception room will be converted into new office, which right beside the new massive reception area.

Word Count: 179

Answers On The Same Topic:

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development. Overall, the office is expected to undergo significant internal reorganisation, with more space allocated to offices and meeting facilities, while outdoor and communal areas will be reduced or relocated. In terms of internal layout, the office building […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed changes for its future development. Overall, the office building will undergo a significant transformation, characterized by the relocation of functional rooms and the repurposing of outdoor spaces to accommodate more professional facilities. At present, the building is flanked by two grass areas […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development. Overall, the office building is expected to become more modern and functional. The kitchen and canteen will be removed and replaced with additional office space, while the grass areas will be redeveloped into an outdoor seating area […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps show how an office building looks now and how it will change in the future. Overall, the building will have more offices and a new meeting room. The kitchen, canteen, and grass areas will be removed. Looking at the inside of the building, the kitchen and canteen located in the top-left corner will […]

The diagram below shows what an office building looks at present and plans on future development. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams illustrate the current layout of an office building and the proposed plan for its future development. Overall, the building is expected to undergo significant restructuring, with most individual offices replaced by an open-plan working space and several new facilities added, including a meeting room and a coffee area. At present, the office consists […]

See All

Other Topics:

The maps show the town of Wildan in 1990 and today. Summaries the information by selecting and reporting the main features and make comparisons where relevant.

The maps compares the differences of town of Wildan in 1990 and today. Overall, it is clear that Wilden has changed from an industrial area into a more residential area. Most of industrial sites have been replaced with houses and facilities, while the road and the river have remained same. In 1990, on the northern […]

The maps show the town of Wildan in 1990 and today. Summaries the information by selecting and reporting the main features and make comparisons where relevant.

The maps compares the differences of town of wildan in 1990 and today. Overall, it is clear that wilden has changed from an industrial area into a more residential area. Most of industrial siutes have been replaced with houses and facilities, while the road and the river have remained same. In 1990, on the northern […]

The diagram below shows a library before and after renovations.

The provided maps illustrate the layout changes that took place in Taftsville public library in the past and the present day. Overall, the library has undergone significant modernisation, featuring garden surrounded with greenary, magazines and expansion of reading zones. In the past, the main entrance situated at the bottom of the map, leading the parallel […]

The diagram below illustrates the current layout and proposed development of the biomedical campus at a university. Provide an overview of the information by identifying and describing the key details and include comparisons where appropriate.

The maps illustrate the current layout of the biomedical campus and the proposed changes for the future. Overall, the area will undergo significant changes. The most noticeable changes will be the removal of several trees and the relocation of the road. Looking first at the western part of the area, the road will be relocated […]

The diagram below shows a small local museum and its surroundings in 1957 and 2007. Summarize the information by selecting main features,and make comparisons where relevant

These maps give detailed information about the dramatic alterations in a small local museum and its surroundings in 1957 and 2007. Overall, the small museum and its surrounding environment have become more diverse and visitor-friendly with the introduction of a wide range of new facilities. It is also clear that the majority of the changes […]

The maps below show the Riverside Park in 2010 and now.

The map illustrates the changes that have taken place in the Riverside since 2010. Overall, the riverside park has become more convenient and modern, and there have been significant changes in the park, with the introduction of new recreational facilities. Some areas of the park have remained unchanged. Looking at the details in the first […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.