The diagrams elucidate evolution of an office building layout in the present and projections on future development.
Overall, the office building is expected to experience significant modifications. The noticeable alterations involving the demolitions of grass zones, kitchen, and canteen, the addition of some new facilities, and the relocation of office, reception, and restroom.
At present, the only entrance is located at the southeast bottom of the map, while opposite it, there is a reception, which is in the similar way. The southern region is dominated by plenty of offices, which are adjacent to the reception. Meanwhile, in the west and the east, two grass areas are established to create a large space for recreation activities and others. The kitchen is built on the top, beside grass zone in the northwest, whereas the northwest top is home to stock room, there is a canteen in the middle. Parallelly, the restroom is positioned directly across from the stock room to the northeast.
In the due course, the diagram is anticipated to undergo some considerable adjustments. The infrastructures’ locations in the south will change, they expect to move two offices to make more space, the reception will be removed to the middle of two offices, while two grass areas will be knocked down to make way for an outdoor seating area in the west and a meeting room in the east. Furthermore, the kitchen and the canteen are projected to converted into two offices, whereas the stock room will remain in its former position. The restroom will be located on the right-hand side top of the layout. Additionally, there will be a coffee shop and a machine shop outside the office building, which will locate on the northeast top of the map.
