The given maps illustrate how a particular area has been developed since 1995 until now.
Overall, there have been many changes in the area both in infrastrucure and urbanizational level.
In 1995 there was nor bridge connecting two sides of the area, instead ferry service was widely used to interconnect two banks of the river. Nowadays, nonetheless, two separate bridges serve for the population, one for cars and another one is for pedestrians making crossing the river easier than before. Three decades ago there was a wood area on the left bank of the river, however, that part has been converted to car park lot. Another car park area has been erected on the other side of the town near the apartment building where there had been only assford before. Numerous houses have been constructed along the road on the right bank of the river including between foot bridge and road bridge. Furthermore, another car park has been developed in the south of the foot bridge.
