A quick glance at the diagram illustrates how many linear phases are required in order to manufacture/produce fish pie for end-users.
By and large, the linear procedure of making fish pie makes up of roughly 8 phases from delivering potatoes and salmon /Ving+O/ for the consecutive stages to /Ving+O/ storing and dispatching.
In terms of taking a look at the initial stages, potatoes are delivered to the production area for up to one month. Having delivered in the center, the potatoes are cleaned, peeled, and sliced. In the following stages, the potatoes are boiled and chilled. As soon as the store collects then drop the next stage them. This time, fresh salmon is delivered to another production area and add lemon juice and salt for 12 hours or less. In the subsequent stage, the juiced and salted salmon is steamed oven after here, there is human involvement concerning removing skin and bones. During this stage, salmon waste is disposed of in the device. The last human involvement concern is the inspection of salmon. When the inspection salmon is added prepared peas and prepared sauce. During this stage, dropping the potatoes are added to the salmon. When being wrapped and frozen. Finally, the fish pies are ready to be delivered to store dispatch in the user’s hand.
