The plans below illustrate the lagout of a school that took place between 2004 and 2024.
Overall, it is clear from the maps that the school has gone through several changes, becoming much larger. The main developments are moving the sports field to the southern-east part of the school and constructing an additional school building in place of the sports field in 2004.
Looking more closely at the maps, we can see that the sports field, which was located in the south of the school, which was noticeable because of its huge size in 2004, has been moved to the southern-east part of the school, being minimized, and it looks like a rectangular shape now. Another major change is the construction of the third school building at the end of the path, where the sports field was located in the former period. Almost one thousand pupils are able to attend school now, compared to six hundred in 2004.
Turning to other changes, it is noticeable that the second car park has been built behind the third school building nowadays, and as a result, a new road has been built running directly to this car park from the main entrance. The other physical structure that has been added over the past two decades is connecting the first school building with the second one; consequently, the path has been shortened and serves as a link between only school buildings but not the main entrance to buildings as it used to be in 2004. All other structures within the design of the school remained unchanged over the period shown
