The maps illustrate the campus of a school in 2004 and the changes that will be made in the school grounds in 2024.
Overall, the school is expected to have more buildings in order to accommodate a larger number of students, and additional car parks will also be constructed. However, the forest area is projected to remain untouched for the clean atmosphere.
The sports field that was initially at the northeast of the campus will be moved to the east, and an additional car park and school building 3 will be built at its original location. Besides, a new road is projected to connect the main road to the new car park, passing both school building 2 and sports field.
The car park that situated near the main entrance will remain the same. The school building 1 and 2 will be connected through a pathway, which blocks the original path connecting the main entrance and the old sports field. Because of the new building and facilities, the number of students is predicted to increase from 600 to 1000 in 2024. For clean air, the forest in the south will be maintained and new trees will be planted to the east of the new car park.