The two maps illustrate how the school area has changed between 2004 and 2024. Overall, the school underwent a significant development, with major changes including constructions, a sports center, and a car park. However, some parts of the school have remained unchanged; others have been completely transformed.
Looking first at the school of 2004, there were only 600 students who studied there. A significant area in the north was dedicated to two main study buildings and a small sports center, which have a small path to enter these constructions. On the other side of the school campus, there were only different types of trees. Opposite the main entrance, the car park was located.
However, by 2024, the school had changed considerably. With the construction of the third main study building, resulting in the relocation of the sport center. The sport campus was reconstructed to the outside of the main area and became smaller. Between the other two main buildings, a new corridor had been erected, which can connect them. Additionally, a new car park was constructed near the third school building. Furthermore, the students of the school had increased and reached 1000. Finally, a road was expanded, covering the main place of the school, although the first car park and trees remained unchanged.
