Our system will evaluate the answer based on this AI-generated description.
The image shows two school site diagrams, one labeled "School Site - 2004: 600 students" and the other "School Site - 2024: 1,000 students". In the 2004 diagram, there are two school buildings labeled "School Building 1" and "School Building 2", a "Sports field", and a "Car park" with an adjacent main road. There are several trees and a singular path connecting the two buildings and leading to the car park. In the 2024 diagram, there is an additional building labeled "School Building 3", the sports field and car park are labeled with the same names, and two new paths labeled "Path" are connecting the new building to the main road and the other school buildings. The sports field remains the same size.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The maps compare the site of a school in 2004 the plan for shifts to the school site in 2024.
In general, the school site larger rather in 2024 rather than the school site in 2004. In 2004 school site had got 600 students but in 2024 school site had got 1000 students.
In 2004, school site had got two school building, car park, and the sports field however, school building three and car park two built at the school site in 2024 instead of sport field. Among the path school building one and school building two 20 years later two buildings were combined and the path was divided into two equal parts.
In 2004, the school building two behind the garden later some trees cut until oldest sports field that is newest school building three and built road. In addition, it will be new sports field built but new sport field smaller rather than oldest sport field.
Word Count: 158