
Our system will evaluate the answer based on this AI-generated description.
The image shows two schematic diagrams of the "Southwest Airport" for "Now" and "After Development." The "Now" diagram includes a main building with Security, Passport Control, and Customs separating Departures and Arrivals. There are four gates numbered 1, 2, 3, and 4 extending from the building. A café is located near gates 1 and 2, and check-in facilities are present within the main building. The "After Development" diagram features a similar but expanded layout with additional sections. The main building still houses Security, Passport Control, and Customs dividing Departures and Arrivals. The new gates are numbered 7 through 17, with new walkways connecting the main building to gates 8 and 9 on the north side and gates 10 to 12 on the south side; gates 16 and 17 are at the terminal ends of these extensions. A café is positioned near gate 12, while additional amenities such as a Bag Drop, ATM, Car Hire, and Sky Train have been added, enhancing passenger convenience.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The redevelopment plans illustrate the layout of the southwest airport and how it will look in the upcoming year.
Overall, the southwest airport will be changed significantly. New features will be incorporated and it will be transformed from an ordinary airport to a modernized one.
On the southern side of the airport, there are some noticeable changes. At present, there are two gates, departure and arrivals. There will be two entrances for each gate. In the security passport control area, there are only a check-in area and a cafe. After redevelopment, check-in will be replaced by bag drop and the cafe will be replaced by check-in, while a new cafe will be relocated to the corner. Moreover, in the passport control customs a cafe, ATM and car hire facilities will be incorporated and the area will be expanded.
A significant change will be in the northern part of the airport. Shops will be constructed there. The walkway will be replaced by the sky train. The number of gates will be increased; 10 more gates will be built, and the total gates will be 18. The shape of the building will be transformed from rectangular to Y-shaped.
Word Count: 196