The map compares the layout of the construction of hydroelectric power dam as it was in 1980 with its renewed design in 2000. Overall, this area had undergone several modifications. In 1980,the area primarily focused on agricultural facilities and biodiversity, after the redevelopments, this site became more leisure-oriented and hospitable services. The major change was the construction of hydroelectric dam, making the site more industrial zone.
In 1980, the river was located in the middle of the map, dividing in two sections. To the right-hand side, there was an irrigated farmland, on the top and bottom side of which mountains were situated. Also, map featured residential houses next to farmland. To the left-hand side of the river, rare plants and animals were located with a dense cluster of trees and on the above of them, there were ancient structures and forests, becoming more tourist-friendly.
This area had experienced some modifications after erecting hydroelectric dam in the middle of the river in 2000, next to which lake and fishing sites had introduced in order to be more appealing for visitors. The new hotel was built instead of village and it was situated on the bottom of the map. ON both sides of the river, electricity was added, making more industrial/ Lastly, while mountains had remained untouched , ancient structures on the top left-hand side had converted mountains.
