The map illustrates a school’s project change in 1985 and now.
Overall, the school’s main areas changed significantly over the period, including the car park and road system, which were renewed. Playing fields were contracted, and a new building, which included a Pool and Fitness center. In addition, the Library disapproved and alternatively built the Learning Resources Centre and Classrooms, and a road that linked the car park with the Playing Fields was removed and remained open with a small number of trees.
In 1985, a car park system was placed in the upper part of the map, and it was surrounded by square shaped road that crossed the central area and connected with the playing field, and nowadays its shape changed semicircle. The office was located on the north-west side of the car park, which remained unchanged. With reference to the school population students numer increased over the period from 1,500 to 2,300.
A large area in the map was a playing field, standing on the bottom, was contracted, and the rest of the south-west part was built with a new building, which included a pool and fitness centre. Although the classroom block position remains unchanged, its storeys were increased from 2 to 3. In the western part was a library and classrooms, but in the present day library has disappeared and its position replaced by the learning resources centre, which include computer room and classrooms position was change under this building. However, among the classroom block and the playing fields, new classrooms were built, and the road disappeared from the central area and remained open with a few trees.
