The layouts illustrate the proposed changes to an office building.
Overall, it is apparently ready that the building will become more interactive. The most noticeable changes are the extension on one side of the building to make room for public facilities and the renovations of existing features.
Turning to the entrance area, we can see that at present the main entrance is situated at the right side. However, it is planned to be relocated to the center, and four small offices on the left side of the old entrance will be merged into two larger ones, each positioned on either side of the new entrance.
Looking at the main area, there will be a removal of the grass sector on the right side of the building to make way for a new meeting area with some chair rows and a new coffee machine. While the kitchen and canteen will be repurposed for two additional offices, the storeroom will remain unchanged. Moreover, an outdoor seating area and some chairs will take the place of the grassy area on the left side of the building, and the entrance of this area will stay the same. Meanwhile, the current restroom near the storeroom will be moved to the top-right corner of the map.
