The diagram illustrate renovation of theatre from 2010 to 2012.
It clearly depicted that a massive change was found in 2012. And some key elements of the previous one is either added, replaced or shifted.
In 2010, size was quite small with storage, dressing room and a cafe facilities. Beside there was a admin office attachted with ticket office just near the main door which is oposite of the cafe. And at the center of the building there has a stage and a auditorium
And in case of 2012, All the element is quite obvious but the stage size was closely double from the previous one. In additon, there built a restaurant in case of cafe and there aslo added a corridor and a showers in the oposite site. Some section like admin office, ticket office, storage facilities and dressing room was just shifted one place to other.