The picture illustrates the changes made to a small theater over a span of 2 years between 2010 and 2012.
Overall, after two years, the theater became noticeably larger with the expansion of its upper and lower sections, and all of its facilities were either repurposed or relocated, albeit with exception for the auditorium and the stage.
Regarding the top of the theater, it was noticeable that the stage was enlarged in the northern direction, with an addition of the hall behind it, which connected to the storage and the dressing room. To the left of the stage, the dressing room replaced the storage, relocating to the opposite side of the stage. The dressing room was adjacent to new showers in 2012.
Turning to the remaining areas of the theater, the auditorium remained unchanged. In contrast, the theater’s foyer significantly expanded. In the corner to the right of the main entrance, the cafe was transformed into a ticket office, which previously was in the left with an administrative office. Within 2 years, this space was now occupied by the restaurant, while the admin office was moved further back, to the left side of the seating area.
