The maps illustrate how an office building was transformed into a dental clinic.
Overall, the building underwent a number of major changes, with the most significant one being the construction of numbers of treatment rooms around the north east side of a clinic. Of particular note is the replacement of large central office to a new treatment room.
Prior to alterations, the office building had three different-sized office rooms which was positioned in the center areas and the one in the south-east corner. Noticeably, what could be seen is the free plan office on the right-hand side of the area surrounded by three office rooms, while the reception could be found on the left side of entrance following closely by a kitchen.
After the reconstruction of a building, what is obvious is the four rooms for treatment which substituted with all office rooms and open plan office in the east. However, toilet feature was relocated to the west right above the storage area, despite these changes,entrance and reception section retained its original position. Meanwhile, the new feature named sterilization was constructed in the south in close proximity to third treatment room , thereby replacing the former toilet location.