Our system will evaluate the answer based on this AI-generated description.
The image shows two diagrams labeled "Southwest Airport" with "Now" and "After Development" plans. The "Now" diagram features a central airport control with six elements (gates 1-5, car park) surrounding it, labeled in clockwise order from the top left [car park, gates 1 and 2, gates 3 and 4, passport control and security, gate 5]. The "After Development" diagram shows the same central control but with fifteen elements, including additional facilities (gates 6-15, car park, check-in area, railway, bus station, car hire). The arrangement of elements differs, with the additional facilities appearing between the original ones, except for the bus station and railway that are placed together opposite security and passport control. No numerical data/percentages are visible.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The current structure of an airport and plans for reconstruction of the site in the coming year and how they will appear are shown in the given diagram.
Overall, the area of gates will be expanded, and more facilities for the convenience of the customers will be added.
Currently, the airport has one entrance for departure, which will be changed by adding two entrances. Similarly, arrival entrance will be two in the future plan. In the departure area, the checkout counter and café will change places, and a bag drop will be installed there. Moving forward, after clearing the security passport control check, an empty space is there that will soon be converted into a dedicated space for shops.
The gates area will expand and accommodate 18 gates, which is currently 8, and the walkways will be replaced by the skytrain for better convenience. After arrival, people will be able to use the facilities, such as a café to get some food or an ATM, and car hire, which is going to be installed next year at the arrival area.
Word Count: 180