The maps illustrate some changes of that were made to an airport now and how it will look after renovation.
It is clear that a number of major changes were made to ann airport now and how it will look future renovation. These include check in, cafe walkway and gates.
Looking at the charts in more details, we can see that the security passport control and passport control customs was remain unchanged over the period. Check in was modified bag drop. Cafe was right top corner future development it will be left hand corner site. Walkwat was converted to sky train. Gates was expanded 8 to 18 over the period.
The two maps also show that passport control customs side was empty atm and car hire newly built with it throughout this period. 8 gates was expanded 18 gates over the period. Bag drop will be newly built. Security passport control was added to shops.
