Our system will evaluate the answer based on this AI-generated description.
The image exhibits two layout plans labeled "SOUTHWEST AIRPORT," one captioned "NOW" and the other "AFTER DEVELOPMENT." The current layout displays a building with seven sections: security (1), passport control (2), customs (3), check-in (4), café (5), walkways (6), and gates (7). The future development indicates an expansion to eighteen sections with added features: bag drop (8), ATM (9), sky train (10), car hire (11), check-in (12), café (13), security (14), passport control (15), customs (16), walkways (17), and gates (18). The bottom of the image provides a legend correlating symbols to their respective services like check-in desks, bag drop, café, ATM, sky train, car hire, walkways, and gates.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The given maps illustrate the area of airport at present and how it will look after reintroduced next year.
Overall, it can be seen that, the airport has been developed a lot but there are some similarities between the two maps. Like there are added some new feature, while some are remained stable.
Looking at the map in more detail, in north side of the airport, there are walkway but it will be expanded and build sky train in the next year. In the north west side, there are added new shops and also added one departure and one arrival. After that, replace the check-in and chance to constructs a bag drop as well as cafe will be changed, which is replaced to north side of the map and check-in replaced, where was coffee shop. Right side of the airport, also constructed some new feature. In the nort east side, will be add cafe and ATM. A car hire build and expand the airport in the next year.
However, security passport counter and passport control customs do not change.
Word Count: 179