Our system will evaluate the answer based on this AI-generated description.
The image exhibits two layout plans labeled "SOUTHWEST AIRPORT," one captioned "NOW" and the other "AFTER DEVELOPMENT." The current layout displays a building with seven sections: security (1), passport control (2), customs (3), check-in (4), café (5), walkways (6), and gates (7). The future development indicates an expansion to eighteen sections with added features: bag drop (8), ATM (9), sky train (10), car hire (11), check-in (12), café (13), security (14), passport control (15), customs (16), walkways (17), and gates (18). The bottom of the image provides a legend correlating symbols to their respective services like check-in desks, bag drop, café, ATM, sky train, car hire, walkways, and gates.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The given plan depicts the current site of an airport and how the same place will look after redevelopment in upcoming year. Looking from an overall perspective, the area of Southwest airport will increased as well as new features will be added in like bag drop, ATM, Sky train and car hire.
According to the plan of development, if we look from south there are addition of points in both departures and arrivals. The new facilities added in Departures is the bag drop and relocate the points of check-in and café. Along with that, several features like car hire, ATM and café added there as well. Coming toward the North, The place of walkway will be transformed into the Y shaped Sky train station with more gates. There will be 18 gates around the area of Sky train and also added Shops below the gate 1.
Overall, all the space will utilized with new features and facilities.
Word Count: 157