The two maps illustrate the layout of southwest airport at the present and its future plan at the next year. Overall, the airport will be underwent significant changes. Not only will its interior design be developed but its exterior design also will be expanded.
Currently, the airport contains three parts. The east part is considered for entrance to the airport with only one door for passengers’ arrival, while the west part is for existence and has only one door for departure, with the third section being located to the north of these parts. After entering to the airport, passengers encounter the passport control customs. Moreover, before existing, they go through security passport control, to the east and west of which are a café and a check-in, respectively. Passengers now use walkway with eight gates at the third part.
Looking ahead, we can see major developments. Chief among them will be extended the third part in a Y shape. In addition, the walkway will be replaced by the sky train, with the gates being increased to 18 numbers. Moreover, amenities such as a café and an ATM will be added in the east part, along with adding a section for car hiring to the east side of entrance doors. Furthermore, at the existence hall, the café will be relocated to the west side of departure doors and will give its place to the current check-in section, and a bag drop is going to added in the place of current check-in. the number of entrance and departure door also will be doubled.
