The maps illustrate the village of Bunborough present day and the the future plan which will be implemented in 2024.
Overall, the houses will be relocating and a railway track will be built in the future for transportation.
Talking about the ways of transports, a railway line will be implanted from the right of the top of the map to the bottom of it, connecting the two villages. The road which located in the top of the village connecting the housing area the Maychester to Lynwhich will be splited to achieve the down side of Bunborough.
Now, look at the central area, we can see that it will be more urbanized receiving more houses on the top. In addition, a promenade will be built on the shore, where in the present is located the fishing port. Touristically site of two hotels will be placed one next to the promenade and another on the beach area.
