The provided maps illustrate differences between the infrastructure of the city in 1995 and 2025 years.
Overall, the size of the city remained the same, but there have been significant changes because all the buildings have been replaced by other ones.
In 1995, the city was divided in two categories: work building on the west side, and entertainment programs on the east side. At the northwestern corner there is located farmland, below it there is the same size mainroad. Under the main road there is a fishing port with further access to the beach. Opposite farmland is Forest park, below which I shape a hotel next to shops and cafe. At the bottom right corner there is a special beach.
In 2025, all borders have been asymmetrized by 70/30 at the top and 30/70 in the middle. In the place of farmland a new road has been constructed. Next to the right of it, the forest park has been cut-down, and a new shopping mall opened. Hotel, shops and cafe were replaced by shopping mall restaurants and apartments. On the left side from there a golf course with the car park has been built. At the bottom there is continuation of apartments
