The layout demonstrates present sports centre in university, and the same centre after reconstruction in future.
Overall, it can be seen that there are common facilities in present such as gym, changing room, pool, reception, seating and outdoor courts. However, in the future, plans offers many facilities to attract people.
According to the map, in present gym is situated in the northern side, obtaining petite amount of space. Changing room is located on the left side of the gym. Whereas, reception lies on the south side in the main gate. Moreover, seating area situated in the eastern side opposite to the outdoor courts. The 25m pool lies in the centre of the map while outdoor courts places in west and eastern side of the layout.
Additionally, after the redevelopment outdoor courts will completely eliminated and constructed two side studio in the eastern side. While utilizing the space of outdoor courts, sports hall will be established beside the dance studio. Outdoors courts on the western part will replaced by the leisure pool. In contrast, changing room was removed in both southwestern and southeastern part. In addition, sports shop and cafe will introduced in the southern part at the main entrance. While gym and changing room, 25m pool, seating area will be still remain unchanged.
