The given maps illustrate an island’s transformation before and after the construction of tourist facilities.
Overall, the island underwent significant development, with the addition of accommodations, a reception area, a restaurant, a pier, vehicle tracks, footpaths, and a designated swimming area.
The construction involved two distinct residential districts, with a reception area in between, connected by a vehicle track and surrounded by six accommodations on the left and nine larger accommodations on the right. Footpaths connect these accommodations, forming a circular layout.
Furthermore, leisure facilities were added, including a pier with a connected vehicle track to the reception area, restaurants positioned on the northern part of the island, and a swimming area with direct access to the beach on the western side, connected to the smaller accommodation area via footpaths.
