🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 8+: You should spend about 20 minutes on this task. The plans below show the site of an airport now and how it will look after redevelopment next year. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

Image for topic: You should spend about 20 minutes on this task. The plans below show the site of an airport now and how it will look after redevelopment next year. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.
Our system will evaluate the answer based on this AI-generated description.
The image shows two plans of an airport: the left plan is the current layout, while the right plan is the post-development layout. Currently, the concourse includes check-in (1) on the left, café (2) adjacent to check-in, walkway (3) connecting to security passport control (4) with single gates (5). After development, check-in (6) moves across, next to it is café (7), two walkways (8) split into Y-shape with three branches, incorporating security passport control customs (9), leading to gates (10, 11, 12, 13, 14, 15). Additional elements include car hire (16), new shops (17), café (18), bag drop (19), ATM (20), sky train (21).
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagrams below illustrate the current layout and the changes that will be made after the renovation next year.

We can see a significant expansion of the airport, including an increase in the number of gates, the addition of new facilities such as a sky train in the middle of the airport extension, and the addition of shops.

Currently, the airport has a simple structure with only a single path leading to eight gates. The departures and arrivals areas are located at the bottom, with basic facilities such as a café and check in. Security, passport control, and customs are positioned between this section.

After redevelopment, the airport will be essentially larger and more detailed. The number of gates will double from 8 to 18, with a Y-shaped exterior. A sky train will be added to transport passengers to the gates more efficiently. In addition, several new facilities will be added, including shops, an ATM, and a car hire service.

In conclusion, the redesign will make the airport more spacious, convenient, and capable of handling a higher number of passengers.

Word Count: 180

Answers On The Same Topic:

You should spend about 20 minutes on this task. The plans below show the site of an airport now and how it will look after redevelopment next year. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The produced illustrations demonstrate the variations to be occurred at an airport in an upcoming year. Overall, it can be explicitly seen that the place will undergo dramatic changes, but the most noticeable changes would be sky trains, shape of concourse and car hire. Delving deeper into the given data, it is crystal clear that […]

You should spend about 20 minutes on this task. The plans below show the site of an airport now and how it will look after redevelopment next year. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The plans demonstrate the current model and the alternations in the next year of the southwest airport. Overall, it is noticeable that the airport will be expanded to accommodate more gates. Moreover, amenities and facilities will be added for the convenience of the passengers. The departure hall is on the left as one faces the […]

See All

Other Topics:

WRITING TASK 1 You should spend about 20 minutes on this task The maps below show the village of Stokeford in 1930 and in 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words

The image displays two maps comparing the transformation of village of stokeford in the 80 years period between 1930 to 2010. Overall, the bridge in the north as well as river didn’t exhibit major changes. Nevertheless, there were a host of alterations in the design of the areas. For instance, there existed an exponential growth […]

The map below show a school in 1985 and the school now.

The map below give a shape of school in 1985 and the school right now. Overall,the arie of playing fields show a big changing,and pool,fitness centre appeared on the map.In past their is a library ,but now it has become a learning rescaces ceantre with computer room and classrooms.While the office does not move. In […]

The maps below show the present layout of the Lakeside Amusement Park and the proposed developments for the site by 2035. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate how the Lakeside Amusement Park will change its layout by 2035. Overall, the park will be less spacious than it’s in present. The site will be occupied by advanced facilites along with number of new activities to try out for fun. The park will also allocate a space specifically for children. […]

The maps below show the changes experienced by the town lakeside at the beginning of the 21th century.

The maps compare the changes experienced by the town lakeside between 2000 and 2029. Overall, the town was considerably developed, with several new facilities replacing the old warehouse and industrial complex. In 2000, lakeside had a residental area in the north-west, an old town and derelict warehouse. There were also an art centre and school. […]

The maps below show the changes experienced by the town lakeside at the beginning of the 21th century.

The given two maps show the change made in the town called lakeside in 2000 and in 2009. According to the map,in 2000,the lakeside town was undeveloped . There was one lake from where river comes to the town. There was three residental area in the town, one was in Southeast and another was in […]

The maps below show the changes experienced by the town lakeside at the beginning of the 21th century.

The difference between of two maps which is lakeside of 2000 year replaced by lakeside of 2009 year. some infrainstruture changes which are 6 strucutre and they are car parking, offices, university, cinema , shopping center and others. Mainly 6 structure are changed in this figure before maps Derelic waterhouse replaced by car park,old towers […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.