The maps show how Pancha village changed between 2005 and 2015.
Overall, the village had been expanded considerably, involved major changes to transport infrastructure, education amenities, and land use, with redused residential areas integrated to a more centralized layout. Also, prayers location improved and added one new building.
Before the development, the village had not had asphalt route and communication antennas. There were only primary school one the north east side, eight housing areas without connection tools, and Pagoda included two buildings in 2005.
After a decade, this village was transferred into more moderinized and visitors friendly with fixed road and additional road- signs and street-lamps. Households set up new antennas to connect newly built two main ones, but two of three homes removed which had located between Pagoda and school area. School improved and was accessible for both-primary and secondary schoolchildern. Additionally, markets and monks buildings were organized and separated from 5 and 2 in 2005 to 8 and 3 in 2015, respectively.
