The plan depicts the developments that occurred in a particular after a hydroelectric power damage had been built up during a 20 – year period of time.
The feature that stands out the most is that the area became much less green and was transformed into an industrial area instead.
By 2010,all the western part of the illustration with woods,ancient buildings,and the area that had been inhabited with unique flora and fauna and mountains below were cleared .Only mountains at the top of the map from each side of the river were remained intact.Talking about the right side of the picture we can see that both villages and irrigated lands for farms were removed with purpose of setting up a hotel .
Furthermore, the river was lessened in length to construct a hydroelectric dam in the middle with mountais from each side;furthermore, the second half of the river was replaced with a lake , where now together with sealing ships, some fish live.From both sides of the water there special electricity facilities as well as villages on the right side, where 20 years ago mountains took place.
