The map illustrates the changes that happened between 2005 and currently in the health facility where patients receive treatment.
Overall,it can be clearly seen that over a long period, the hospital developed and changed a great deal as new facilities such as a children’s playground and minor operations room.
With regards to the 2005 period, this clinic was smaller than it is now. The entrance was at the bottom, and as you enter, there was a corridor where in the middle located the reception desk and five rooms around such as consulting rooms, office and physiotherapy room. At that time, the parking lot was only for 12 cars, and fences covered the surroundings out of the garden.
After the innovations, the entrance was relocated to the left side of the clinic, and patients were treated in newly built units. This center was considerably changed, the structure became larger due to the addition of new rooms, and certain areas were reduced in size. They construct a room for surgical procedures, and consulting rooms are now four instead of three. Additionally,the existing parking area was expanded, creating 30 additional spaces.
