The two plans below illustrate the health centre change between 2005 and nowadays.
Overall, since 2005 minor operations room had been added there, also many rooms had been divided into smaller rooms. Car parking places had been increased too.
According to the plans, consulting room number 3 had been replaced by children’s play area and reception desk, enterance has been rescheduled here too. On the place of old enterance there were builded two more consulting rooms, CR1 and CR2. Main hall has been expanded a little bit than in 2005. About parking, spaces for cars has increased from 12 to 30 spaces overall. Rooms like physiotherapy room, office remained the same as in 2005. Old consulting rooms 1 and 2 have been reduced a little bit to make bigger hall and were renamed to CR3 and CR4. By the way, gate in south-west was removed to north-west of the building. However only garden outside stayed the same as in 2005.
